Uncategorized

[Unscheduled Outage] Internet and off campus resources slowness – 9/30/22 at 3:54PM

Unscheduled Outage: Internet and off campus resources slowness

DATE/TIME: 09-30-2022

DURATION: On going

IMPACT: Internet slowness, delays in email, uAchieve audits, and all off campus resources.

REASON: The primary internet was damage north of Colorado Springs.

Currently we are sharing the backup connection with UCCS. Normally operations would not be affected as this has happened in the past. UCCS is seeing slowness as well.

Currently the Front Range Giga Pop (FRGP) is investigating the cause of the slowness with its subcontractors.

As for the Primary internet connection, repairs are underway.

[Scheduled Outage] Power Outage in the LARC 9-10-22 at 8am

Please be advised that the power to the LARC will be shut down Saturday, September 10th starting at 8:00 am.

We have been informed that this outage is to connect power to the new Verizon tower on campus.

ITS asks you to please shut down your computers and printers in the LARC when you leave on Friday 9-9-2022.

SCHEDULED OUTAGE: LARC Power Outage

DATE/TIME: 09-10-2022 at 8:00am

DURATION: Est: 6 hrs.

IMPACT: All network access in the LARC.

REASON: Installation of the power connection for the new Verizon tower.